當前位置:信管網 >> 在線考試中心 >> 信息系統項目管理師題庫 >> 試題查看
試卷名稱
考試中心《》在線考試
試卷年份2009年上半年
試題題型【單選題】
試題內容

Many of the activities performed during the preliminary investigation are still being conducted in(1 ), but in much greater depth than before. During this phase, the analyst must become  fully aware of the(2 ) and must develop enough knowledge about the(3 ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4 ) for process and data of current system, the deliverable from this phase also includes the(5 ) for the proposed system.
(1)A. analysis phase
B.  design phase
C.  implementation phase
D. maintenance phase
(2)A. main symptom
B.  root problem
C.  final blueprint
D.  data specification
(3)A. hardware environment
B. testing environment
C. software environment
D. business environment
(4)A. logical models
B. physical models
C. design models
D. implementation models
(5)A. hardware and software specification
B. system performance specification
C. formal requirements definition
D. general problem statement